Skip to content Skip to footer
0 items - P0.00 0

BOS 3-2: 2017 ed.2

P535.80

The handling, storage and distribution of LPG — Part 2: Installation of caravans, mobile units & other small nonpermanent buildings

SKU: BOS 3-2: 2017 ed.2 Category: Product ID: 28093

Additional information

ICS Code

ICS Name

Edition

Pages

Published Date

Replaced by

Replaces

Sector

Standard Development Stage

Standard Status

Technical Committee

Type of Standards

Description

This part of BOS 3 gives the installation requirements, materials, method of construction and the installation of the equipment used in liquefied petroleum gas applications for mobile units, including but not limited to caravans, motor homes, park homes, mobile kitchens, trailers and semitrailers. It also includes the safety requirements for gas on recreation vehicles and mobile ablution facilities. 1.2 It also covers the requirements for mobile field kitchens and any other mobile units operating on LPG liquid withdrawal systems. 1.3 It also covers the requirements for inspection, test and maintenance of the various components and equipment used. 1.4 Where the container installation does not form a part of the mobile unit and is placed on the ground outside of the unit, then the container placement requirements of BOS 3-1 shall apply and the rest of the installation shall comply with this standard. 1.5 It excludes the requirements for motor vehicles powered by LP gas and mobile units used for filling purposes which can be found in SANS 10087-6 and SANS 10087-10 respectively.

IMPARTIALITY AND CONFIDENTIALITY STATEMENT
The Botswana Bureau of Standards (BOBS) understands the importance of impartiality and confidentiality in carrying out its management system certification activities. BOBS management is committed to gaining and maintaining the reputation, credibility and ultimately, confidence of its stakeholders in rendering its certification services. Additionally, BOBS strives to continuously manage foreseen potential conflicts of duty and interest and ensures objectivity of its activities under the management system certification. To achieve the above, BOBS shall identify, analyse, record and manage potential conflict of duty and interest to ensure that certification services are not provided within relationships that have been identified to pose an unacceptable threat to impartiality. An Impartiality Committee shall periodically review activities of the certification function to verify commitment to credibility and fairness. The Committee shall further assist in the development of policies relating to impartiality of providing certification activities. BOBS is committed to maintaining in strict confidence all information accessed while rendering the certification services and shall ensure that such information is not divulged to third parties without the Client’s written consent unless if required by law.
Demand Quality

When things don't work as they should, it often means that standards are absent.

BOBS Head Office
Physical Address —
Plot No, 55745, Block 8, Mail Airport Road
Postal Address —
Private Bag B048,
Gaborone, Botswana
Francistown office

Physical Address —
Plot No, 44149, MVA Fund House,
1st Floor, Behind Galo Mall
Postal Address —
Private Bag F465,
Francistown, Botswana

BOBS Weighbridge
Physical Address —
Plot No: 20683, Ramakukane
Road, Block 3 Industrial,
Gaborone, Botswana
BOBS © Copyright 1992 – 2024. All Rights Reserved. Developed by Weblogic.
Go to Top