Skip to content Skip to footer
0 items - P0.00 0

BOS 308-6: 2009

P256.50

Particleboards – Part 6: Requirements for heavy-duty load-bearing boards for use in dry conditions – Specification

SKU: BOS 308-6: 2009 Category: Product ID: 28589

Additional information

ICS Code

ICS Name

Edition

Pages

Published Date

Replaced by

Replaces

Sector

Standard Development Stage

Standard Status

Technical Committee

Type of Standards

Description

This Botswana Standard specifies the requirements for boards for heavy duty load-bearing boards for use in dry conditions. Particleboards complying with this standard may also be referred to as P6-boards. This standard does not give requirements for oriental strand boards (OSB) and it does not apply to extruded particleboards.
NOTE 1 These boards have enhanced properties with those specified in BOS 308-4. They may also be used in design and construction of load-bearing or stiffening building elements. e.g. walls, flooring and I-beams.
NOTE 2 Dry conditions are characterized by moisture contents in the material corresponding to a temperature of 20 oC and the relative humidity of the surrounding air only exceeding 65 % for a few weeks per year. Boards of this type are only suitable for use in biological hazard class of EN 335-3.

IMPARTIALITY AND CONFIDENTIALITY STATEMENT
The Botswana Bureau of Standards (BOBS) understands the importance of impartiality and confidentiality in carrying out its management system certification activities. BOBS management is committed to gaining and maintaining the reputation, credibility and ultimately, confidence of its stakeholders in rendering its certification services. Additionally, BOBS strives to continuously manage foreseen potential conflicts of duty and interest and ensures objectivity of its activities under the management system certification. To achieve the above, BOBS shall identify, analyse, record and manage potential conflict of duty and interest to ensure that certification services are not provided within relationships that have been identified to pose an unacceptable threat to impartiality. An Impartiality Committee shall periodically review activities of the certification function to verify commitment to credibility and fairness. The Committee shall further assist in the development of policies relating to impartiality of providing certification activities. BOBS is committed to maintaining in strict confidence all information accessed while rendering the certification services and shall ensure that such information is not divulged to third parties without the Client’s written consent unless if required by law.
Demand Quality

When things don't work as they should, it often means that standards are absent.

BOBS Head Office
Physical Address —
Plot No, 55745, Block 8, Mail Airport Road
Postal Address —
Private Bag B048,
Gaborone, Botswana
Francistown office

Physical Address —
Plot No, 44149, MVA Fund House,
1st Floor, Behind Galo Mall
Postal Address —
Private Bag F465,
Francistown, Botswana

BOBS Weighbridge
Physical Address —
Plot No: 20683, Ramakukane
Road, Block 3 Industrial,
Gaborone, Botswana
BOBS © Copyright 1992 – 2024. All Rights Reserved. Developed by Weblogic.
Go to Top