Skip to content Skip to footer
0 items - P0.00 0

BOS 345-1:2010

P600.00

Wall and floor tiling – Part 1: Design and installation of internal and external ceramic and mosaic floor tiling in normal conditions — Code of practice

SKU: BOS 345-1:2010 Category: Product ID: 28633

Additional information

ICS Code

ICS Name

Edition

Pages

Published Date

Replaced by

Replaces

Sector

Standard Development Stage

Standard Status

Technical Committee

Type of Standards

Description

This standard gives guidelines for the design, installation and maintenance of floor tiling using ceramic tiles and mosaics bedded on concrete, cement:sand screeds, timber, asphalt and existing hard floor finishes in normal conditions. For special conditions see BS 5385-2. The following flooring materials are not included: natural stone (granite, slate, marble, etc.) tiles and slabs of terrazzo, and composition blocks (see BS 5385-5). Individual floor tiles with a maximum facial surface area greater than 0.72 m2 and with length to width ratio exceeding 2:1, might require special bedding procedures in accordance with advice from tile or adhesive manufacturers. Tile fittings for use as skirting, step treads and channels are given in Annex A.. NOTE Where the floor tiling installation needs to meet specific functional or environmental requirements, or to assist in counteracting potentially detrimental effects on the installation and/or the structure, see BS 5385-2. The special conditions described in BS 5385-2, for example, swimming pools, shower areas, etc., are given in Annex B. Recommendations for the design and laying of levelling screeds are given in Annex C. Reference is made to tiles bedded directly to a concrete base, but for the design and construction of concrete bases see BS 8204-1.

IMPARTIALITY AND CONFIDENTIALITY STATEMENT
The Botswana Bureau of Standards (BOBS) understands the importance of impartiality and confidentiality in carrying out its management system certification activities. BOBS management is committed to gaining and maintaining the reputation, credibility and ultimately, confidence of its stakeholders in rendering its certification services. Additionally, BOBS strives to continuously manage foreseen potential conflicts of duty and interest and ensures objectivity of its activities under the management system certification. To achieve the above, BOBS shall identify, analyse, record and manage potential conflict of duty and interest to ensure that certification services are not provided within relationships that have been identified to pose an unacceptable threat to impartiality. An Impartiality Committee shall periodically review activities of the certification function to verify commitment to credibility and fairness. The Committee shall further assist in the development of policies relating to impartiality of providing certification activities. BOBS is committed to maintaining in strict confidence all information accessed while rendering the certification services and shall ensure that such information is not divulged to third parties without the Client’s written consent unless if required by law.
Demand Quality

When things don't work as they should, it often means that standards are absent.

BOBS Head Office
Physical Address —
Plot No, 55745, Block 8, Mail Airport Road
Postal Address —
Private Bag B048,
Gaborone, Botswana
Francistown office
Physical Address —
Plot No, 32367, Donga,
Adjacent Metsef Wholesalers
Postal Address —
Private Bag F465,
Francistown, Botswana
BOBS Weighbridge
Physical Address —
Plot No: 20683, Ramakukane
Road, Block 3 Industrial,
Gaborone, Botswana
BOBS © Copyright 1992 – 2024. All Rights Reserved. Developed by Weblogic.
Go to Top