Skip to content Skip to footer
0 items - P0.00 0

BOS 536-8:2014

P444.60

Basics of structural design and actions for buildings and Industrial structures – Part 8: Actions during execution

SKU: BOS 536-8:2014 Category: Product ID: 27756

Additional information

ICS Code

ICS Name

Edition

Pages

Published Date

Replaced by

Replaces

Sector

Standard Development Stage

Standard Status

Technical Committee

Type of Standards

Description

This part of BOS 536 gives general principles and rules for the determination of actions to be taken into account during the execution of buildings and industrial structures.
NOTE The allocation of responsibilities during the construction process forms part of the contractual documents for each individual project and are generally based on the responsibilities as assigned in appointments and contracts. Such responsibilities are therefore not implied in this part of BOS 536. The standard may be used as guidance for the determination of actions to be taken into account for different types of construction works, including structural alterations such as refurbishment and partial or full demolition (see Annex A). It gives rules for the determination of actions to be used for the design of auxiliary construction works needed for the execution of buildings and industrial structures.This part of BOS 536 does not cover design rules for auxiliary construction works.NOTE These design rules for auxiliary construction works may be defined for the individual project. Guidance may be found in European standards such as EN 12812.Rules concerning safety of people in and around the construction site are out of the scope of this part of BOS 536. Such rules may be defined for the individual project in terms of the relevant national legislation (see foreword).

IMPARTIALITY AND CONFIDENTIALITY STATEMENT
The Botswana Bureau of Standards (BOBS) understands the importance of impartiality and confidentiality in carrying out its management system certification activities. BOBS management is committed to gaining and maintaining the reputation, credibility and ultimately, confidence of its stakeholders in rendering its certification services. Additionally, BOBS strives to continuously manage foreseen potential conflicts of duty and interest and ensures objectivity of its activities under the management system certification. To achieve the above, BOBS shall identify, analyse, record and manage potential conflict of duty and interest to ensure that certification services are not provided within relationships that have been identified to pose an unacceptable threat to impartiality. An Impartiality Committee shall periodically review activities of the certification function to verify commitment to credibility and fairness. The Committee shall further assist in the development of policies relating to impartiality of providing certification activities. BOBS is committed to maintaining in strict confidence all information accessed while rendering the certification services and shall ensure that such information is not divulged to third parties without the Client’s written consent unless if required by law.
Demand Quality

When things don't work as they should, it often means that standards are absent.

BOBS Head Office
Physical Address —
Plot No, 55745, Block 8, Mail Airport Road
Postal Address —
Private Bag B048,
Gaborone, Botswana
Francistown office

Physical Address —
Plot No, 44149, MVA Fund House,
1st Floor, Behind Galo Mall
Postal Address —
Private Bag F465,
Francistown, Botswana

BOBS Weighbridge
Physical Address —
Plot No: 20683, Ramakukane
Road, Block 3 Industrial,
Gaborone, Botswana
BOBS © Copyright 1992 – 2024. All Rights Reserved. Developed by Weblogic.
Go to Top