Skip to content Skip to footer
0 items - P0.00 0

BOS 728:2017

P592.80

The design and installation of natural stone cladding and lining — Code of practice

SKU: BOS 728:2017 Category: Product ID: 27949

Additional information

ICS Code

,

ICS Name

Edition

Pages

Published Date

Replaced by

Replaces

Sector

Standard Development Stage

Standard Status

Technical Committee

Type of Standards

Description

This code of practice gives recommendations for the design, installation and maintenance of mechanically fixed units of natural stone as a cladding held to a structural background by metal fixing.Retrieving data. Wait a few seconds and try to cut or copy again.
a) the standard covers aspects such as
b) traditional handset external cladding;
c) stone-faced precast concrete cladding systems;
d) rain-screen and stone on metal frame cladding systems; and e) internal linings.
NOTE The general principles of cladding also apply to soffits and sloping surfaces.
Recommendations are given regarding movement of the structure, which might occur for one or more reasons, so that such dimensional changes can be accommodated. This standard does not cover stone veneer composite panels or the use of stone cladding as permanent formwork to insitu concrete.

IMPARTIALITY AND CONFIDENTIALITY STATEMENT
The Botswana Bureau of Standards (BOBS) understands the importance of impartiality and confidentiality in carrying out its management system certification activities. BOBS management is committed to gaining and maintaining the reputation, credibility and ultimately, confidence of its stakeholders in rendering its certification services. Additionally, BOBS strives to continuously manage foreseen potential conflicts of duty and interest and ensures objectivity of its activities under the management system certification. To achieve the above, BOBS shall identify, analyse, record and manage potential conflict of duty and interest to ensure that certification services are not provided within relationships that have been identified to pose an unacceptable threat to impartiality. An Impartiality Committee shall periodically review activities of the certification function to verify commitment to credibility and fairness. The Committee shall further assist in the development of policies relating to impartiality of providing certification activities. BOBS is committed to maintaining in strict confidence all information accessed while rendering the certification services and shall ensure that such information is not divulged to third parties without the Client’s written consent unless if required by law.
Demand Quality

When things don't work as they should, it often means that standards are absent.

BOBS Head Office
Physical Address —
Plot No, 55745, Block 8, Mail Airport Road
Postal Address —
Private Bag B048,
Gaborone, Botswana
Francistown office

Physical Address —
Plot No, 44149, MVA Fund House,
1st Floor, Behind Galo Mall
Postal Address —
Private Bag F465,
Francistown, Botswana

BOBS Weighbridge
Physical Address —
Plot No: 20683, Ramakukane
Road, Block 3 Industrial,
Gaborone, Botswana
BOBS © Copyright 1992 – 2024. All Rights Reserved. Developed by Weblogic.
Go to Top