Skip to content Skip to footer
1 item - P450.00 1

BOS 3-3:2011 ed2

P475.00

The handling, storage and distribution and maintenance of liquefied petroleum gas in domestic, commercial and industrial installations Part 3: Liquefied petroleum gas (LPG) installations involving storage vessels of individual water capacity exceeding 500 ℓ -Specification

SKU: BOS 3-3:2011 ed2 Category: Product ID: 24653

Additional information

ICS Code

ICS Name

Edition

Pages

Published Date

Replaced by

Replaces

Sector

Standard Development Stage

Standard Status

Technical Committee

Type of Standards

Description

Specifies requirements for the layout, design and installation of liquefied petroleum gas equipment and of storage vessels of individual water capacity exceeding 500 ℓ and associated vaporizers, pipe work and fittings up the outlet of the first pressure reduction stage in the line. Recommendations are also given in regard to the fitting of automatic and other devices (operative in the event of physical damage to the installation) for the purpose of ensuring maximum security, for the storage of the gas from a design point of view, and for limiting the escape of liquid through normal pressure-relief fittings.

IMPARTIALITY AND CONFIDENTIALITY STATEMENT
The Botswana Bureau of Standards (BOBS) understands the importance of impartiality and confidentiality in carrying out its management system certification activities. BOBS management is committed to gaining and maintaining the reputation, credibility and ultimately, confidence of its stakeholders in rendering its certification services. Additionally, BOBS strives to continuously manage foreseen potential conflicts of duty and interest and ensures objectivity of its activities under the management system certification. To achieve the above, BOBS shall identify, analyse, record and manage potential conflict of duty and interest to ensure that certification services are not provided within relationships that have been identified to pose an unacceptable threat to impartiality. An Impartiality Committee shall periodically review activities of the certification function to verify commitment to credibility and fairness. The Committee shall further assist in the development of policies relating to impartiality of providing certification activities. BOBS is committed to maintaining in strict confidence all information accessed while rendering the certification services and shall ensure that such information is not divulged to third parties without the Client’s written consent unless if required by law.
Demand Quality

When things don't work as they should, it often means that standards are absent.

BOBS Head Office
Physical Address —
Plot No, 55745, Block 8, Mail Airport Road
Postal Address —
Private Bag B048,
Gaborone, Botswana
Francistown office
Physical Address —
Plot No, 32367, Donga,
Adjacent Metsef Wholesalers
Postal Address —
Private Bag F465,
Francistown, Botswana
BOBS Weighbridge
Physical Address —
Plot No: 20683, Ramakukane
Road, Block 3 Industrial,
Gaborone, Botswana
BOBS © Copyright 1992 – 2024. All Rights Reserved. Developed by Weblogic.
Go to Top